Sunday, September 11, 2016

Lock up!!

It was amazing to see how much had been accomplished throughout last week. All architraves, doors, skirting to bedrooms and home theater, glass door to built-ins, main door, rain water tank, water proofing to wet areas are done.

The House at Lock up:

Cordova Two: Classic Facade

A closer look at the front door and the garage: Front door will be later painted in Taubmans Mountain Wine color.
Cordova Two: Garage door in ColorBond Surfmist 

Cordova Two Classic Facade: Front door
Rain Water tank had been installed:

Rain water tank: Colourbond Jasper
All the glass doors to built-ins and skirtings have also been installed:
Cordova Two: Bed 4

Cordova Two: Bed 2

Cordova Two: Bed 3
 Water-proofing has also been done to wet areas:
Main Bathroom

En-suite
 All the cabinets for kitchen, pantry, bathroom vanities are waiting to be installed:

Cordova Two: Cabinets delivered
 Also all the architraves had been completed.

Few more pictures of living area:
Cordova Two: Living area showing door of Mastersuite and HT

Cordova Two: Living Area showing Hallway Entrance, doors to Pantry & Laundry
Kichen Area:

Cordova Two: Open Kichen Area, also showing IT desk area and Bed 4
And garage door from inside:


On our visit, we found that the laundry linen door has been placed incorrectly.


To be honest, we were terrified whether this could be easily fixed as there is a frame inside the linen structure. We informed our SS straight away through email and text. We also spent the whole Sunday and Monday worrying. On Tuesday morning, we called SS and got to know that they fixed it on Monday, took them only half an hour.

But, we expected this should have been discovered by MJH themselves just after Framing was completed more than two months back. Not sure how a framing error like this came this far without anyone else noticing it.

So, with this, the 'Fix-out' stage of our house has been completed. Next comes wet area tiling, followed by Kitchen installation. We are notified by MJH to arrange for pre-tiling discussion on site, also given an option that SS will send pictures of the tiles for confirmation. We haven't decided on how we would proceed yet.