Painting of internal walls, doors, architraves, window frames, main door got completed over the week-end. Here are few photos taken before the Painting was fully complete:
|
Cordova Two: Built-in |
|
Cordova Two: Study nook |
|
Cordova Two: Front Door painted with Taubmans Mountain Wine |
Wet area tiling was completed the week before:
|
Cordova Two: Bathroom |
|
Cordova Two: Shower Area (Tile Cotto Tibur White) |
|
Bathroom Vanity: Polytec Artisan Oak Matt |
|
Ensuite Tile: Cotto Karl Beige |
|
Ensuite vanity: Polytec Gesso Lini Matt |
|
Cordova Two: Laundry (Tile Cotto Tibur White) |
|
Cordova Two: Linen inside Laundry |
No Caesarstone benchtops in kitchen, pantry or bathrooms have been installed yet, will be installed by next week to avoid damages to them by tradies as much as possible.
Outdoor painting should happen throughout this week. Not too many items left to Paint: just Bag & Paint of Front facade, eaves and downpipes. As the internal painting is complete, they will also be moving on with Electrical and Plumbing fit-out!